Pembroke Pines, Florida · Serving the USA, Canada, UK & Australia (850) 343-4090   info@premiumestimatings.com   WhatsApp
CSI MasterFormat · Division 01

Division 01 general requirements and general conditions estimates

Division 01 general requirements and general conditions estimating: supervision, temporary facilities, equipment, insurance, bonds and closeout costs.

Typical sections01 31 00 Project Management01 50 00 Temporary Facilities01 74 00 Cleaning01 77 00 CloseoutTakeoff unitsMonthWeekLSEA%

General conditions are where bids are quietly won or lost. Price them too low and the job bleeds money every month; too high and you lose the bid. We estimate Division 01 based on the project's duration, size, location and specification requirements.

We read the general requirements sections of the spec book, including submittals, quality control, temporary facilities, cleaning and closeout, and turn them into time-based and lump-sum costs you can check against your own experience.

Typical project types

Need more than general requirements? We can price every division on the project. See general contractor estimating.

What we take off and price

  • Project management and site supervision by duration
  • Temporary offices, toilets, fencing, power, water and heat
  • Hoisting, scaffolding and general equipment
  • Dumpsters, cleaning and final clean
  • Testing, inspections and quality control
  • Permits, insurance, bonds and fees
  • Submittals, as-builts, O&M manuals and closeout
  • Safety, signage and traffic control

What you receive

  • Excel estimate organized by CSI division
  • Quantities with waste factors
  • Unit material, labor and equipment costs
  • Summary sheet with cost per square foot
  • Colour-coded marked-up plans (PDF)
  • Written assumptions, clarifications and exclusions
FAQ

General Conditions Estimating: common questions

Can't find your answer? Call (850) 343-4090 or email info@premiumestimatings.com.

What is the difference between general conditions and general requirements?

General requirements are Division 01 of the specifications, the contract's rules for running the job. General conditions are the contractor's cost of meeting them, like supervision, temporary facilities and equipment over the project's duration.

How do you estimate project duration?

We use your schedule if you have one. If not, we estimate duration from the project size and type and state it on the summary so you can adjust it.

Get a quote

Send us your plans for general requirements

Send your drawings and we'll reply with a fixed quote, turnaround time and delivery date before any work starts.

  • Fixed quote and delivery date up front
  • NDA signed on every project
  • Excel estimate organized by CSI division
  • Marked-up plans showing every quantity
  • 50% to start, 50% on delivery
Prefer email or phone?info@premiumestimatings.com(850) 343-4090

Project details

Upload drawings / plans
Drop files here or click to browsePDF, ZIP, DWG, DXF, XLSX, DOC, JPG · up to 5 files, 8 MB total
    Large plan sets: share a link instead of uploading.
    Send Plans Chat on WhatsApp