CSI MasterFormat · Divisions 40–45

Process piping and industrial equipment estimates

Estimating for process and industrial facilities: process piping (Division 40), material handling, process heating and cooling, gas and liquid handling, pollution control and manufacturing equipment.

Typical sections40 05 00 Process Piping41 22 00 Cranes43 41 00 Tanks44 10 00 Air Pollution ControlTakeoff unitsLFEATONLS

Divisions 40 through 45 cover the process side of industrial facilities: the piping and equipment that make, move and treat products. These divisions appear on manufacturing, food processing and treatment projects.

We take off process piping by size, material and schedule, count valves and instruments, and set equipment budgets from the equipment lists. Major equipment is usually quoted by vendors, so we focus on installation, setting and connections.

Typical project types

Need more than process interconnections & equipment (40–45)? We can price every division on the project. See general contractor estimating.

What we take off and price

  • Division 40: process piping, valves, supports and instrumentation
  • Division 41: conveyors, cranes and material handling
  • Division 42: process heating, cooling and drying equipment
  • Division 43: gas and liquid handling, tanks and pumps
  • Division 44: pollution and waste control equipment
  • Division 45: industry-specific manufacturing equipment

What you receive

  • Excel estimate organized by CSI division
  • Quantities with waste factors
  • Unit material, labor and equipment costs
  • Summary sheet with cost per square foot
  • Colour-coded marked-up plans (PDF)
  • Written assumptions, clarifications and exclusions
FAQ

Process Equipment Estimating: common questions

Can't find your answer? Call (850) 343-4090 or email info@premiumestimatings.com.

Why is this one page for six divisions?

Divisions 40–45 are usually estimated together on industrial projects, and each one alone is rarely bid separately. One detailed page serves contractors better than six thin ones.

Do you price process equipment?

We set budgets from equipment lists and recommend vendor quotes for major items. Installation, setting and connections are priced in detail.

Get a quote

Send us your plans for process interconnections & equipment (40–45)

Send your drawings and we'll reply with a fixed quote, turnaround time and delivery date before any work starts.

  • Fixed quote and delivery date up front
  • NDA signed on every project
  • Excel estimate organized by CSI division
  • Marked-up plans showing every quantity
  • 50% to start, 50% on delivery
Prefer email or phone?info@premiumestimatings.com(850) 343-4090

Project details

Upload drawings / plans
Drop files here or click to browsePDF, ZIP, DWG, DXF, XLSX, DOC, JPG · up to 5 files, 8 MB total
    Large plan sets: share a link instead of uploading.
    Send Plans Chat on WhatsApp