Pembroke Pines, Florida · Serving the USA, Canada, UK & Australia (850) 343-4090   info@premiumestimatings.com   WhatsApp
CSI MasterFormat · Division 11

Division 11 equipment estimates

Division 11 equipment estimating: foodservice and kitchen equipment, residential appliances, laboratory, athletic, loading dock and other specified equipment.

Typical sections11 30 00 Residential Equipment11 40 00 Foodservice11 13 00 Loading Dock11 53 00 LaboratoryTakeoff unitsEALSSet

Equipment lines can swing a bid by thousands of dollars. We list every piece of specified equipment from the plans and schedules, separating owner-furnished items from contractor-furnished ones so nothing is priced twice or left out.

Installation, rough-in coordination and connections are noted for each item so you can see what the MEP trades need to carry.

Typical project types

Need more than equipment? We can price every division on the project. See general contractor estimating.

What we take off and price

  • Foodservice and commercial kitchen equipment
  • Residential appliances
  • Loading dock equipment
  • Laboratory equipment
  • Athletic and recreational equipment
  • Waste handling equipment
  • OFCI and OFOI items tracked separately

What you receive

  • Excel estimate organized by CSI division
  • Quantities with waste factors
  • Unit material, labor and equipment costs
  • Summary sheet with cost per square foot
  • Colour-coded marked-up plans (PDF)
  • Written assumptions, clarifications and exclusions
FAQ

Equipment Estimating: common questions

Can't find your answer? Call (850) 343-4090 or email info@premiumestimatings.com.

Do you price commercial kitchen equipment?

Yes. We price the kitchen equipment schedule item by item and note which items are owner-furnished.

How do you handle owner-furnished equipment?

We list OFCI and OFOI items separately so the installation cost is captured without pricing the equipment itself.

Get a quote

Send us your plans for equipment

Send your drawings and we'll reply with a fixed quote, turnaround time and delivery date before any work starts.

  • Fixed quote and delivery date up front
  • NDA signed on every project
  • Excel estimate organized by CSI division
  • Marked-up plans showing every quantity
  • 50% to start, 50% on delivery
Prefer email or phone?info@premiumestimatings.com(850) 343-4090

Project details

Upload drawings / plans
Drop files here or click to browsePDF, ZIP, DWG, DXF, XLSX, DOC, JPG · up to 5 files, 8 MB total
    Large plan sets: share a link instead of uploading.
    Send Plans Chat on WhatsApp