Pembroke Pines, Florida · Serving the USA, Canada, UK & Australia (850) 343-4090   info@premiumestimatings.com   WhatsApp
CSI Division 32 · Trade estimating

Asphalt and concrete paving estimates

Paving estimating for asphalt and concrete pavement, base, curb and gutter, sidewalks and striping. Tons, square yards and linear feet from site plans.

Parent division32 – Exterior ImprovementsTakeoff unitsSYSFLFTONEA

Paving contractors price by section and by ton. We measure parking lots, drives and roads by pavement section, then calculate base, binder and surface course quantities.

Curb and gutter, sidewalks, ramps, striping and signage are taken off from the site plan so the whole paving package is covered.

Part of our Division 32 exterior improvements estimating. You can order this trade alone or with the rest of the project.

What we take off

  • Asphalt paving by course and section
  • Concrete pavement and aprons
  • Aggregate base and subgrade prep
  • Curb and gutter
  • Sidewalks and ADA ramps
  • Pavement markings and signage
  • Milling and overlay
  • Patching and sealcoat

What you receive

  • Excel estimate organized by CSI division
  • Quantities with waste factors
  • Unit material, labor and equipment costs
  • Summary sheet with cost per square foot
  • Colour-coded marked-up plans (PDF)
  • Written assumptions, clarifications and exclusions
Our process

How to order a paving estimating

  1. Send your plans

    Email PDF drawings and specs, or share a Dropbox, Google Drive or bid-portal link. Bid sets, schematic, design development, construction documents and conceptual drawings all work.

  2. Get a fixed quote

    We review the set and reply with a price, turnaround time and delivery date for your scope. You approve before any work starts.

  3. NDA and 50% deposit

    We sign an NDA so your plans stay private. Work starts on a 50% deposit by card through our secure online checkout. A W-9 is available on request.

  4. Receive your estimate

    You get quantities and material and labor pricing in Excel, organized by CSI division, plus marked-up plans. The remaining 50% is due on delivery.

FAQ

Paving Estimating: common questions

Can't find your answer? Call (850) 343-4090 or email info@premiumestimatings.com.

Do you convert asphalt to tons?

Yes. Areas are converted to tons using course thickness and mix density.

Can you estimate mill-and-overlay?

Yes. We measure milling and overlay areas and depths from the plans.

Get a quote

Send us your plans for paving estimating

Send your drawings and we'll reply with a fixed quote, turnaround time and delivery date before any work starts.

  • Fixed quote and delivery date up front
  • NDA signed on every project
  • Excel estimate organized by CSI division
  • Marked-up plans showing every quantity
  • 50% to start, 50% on delivery
Prefer email or phone?info@premiumestimatings.com(850) 343-4090

Project details

Upload drawings / plans
Drop files here or click to browsePDF, ZIP, DWG, DXF, XLSX, DOC, JPG · up to 5 files, 8 MB total
    Large plan sets: share a link instead of uploading.
    Send Plans Chat on WhatsApp