CSI MasterFormat guide · Oct 31, 2026 · 9 min read

CSI MasterFormat divisions list: all divisions explained

CSI MasterFormat is the standard system for organizing construction specifications, bids and estimates in the USA and Canada. It is published by the Construction Specifications Institute (CSI) and Construction Specifications Canada (CSC).

MasterFormat uses division numbers from 00 to 49. Some numbers are reserved for future use, so not every number has a division.

The complete divisions list

Procurement and contracting

Division Title
00 Procurement and Contracting Requirements

General requirements

Division Title
01 General Requirements

Facility construction

Division Title Covers
02 Existing Conditions Surveys, demolition, abatement
03 Concrete Formwork, rebar, cast-in-place and precast concrete
04 Masonry Brick, CMU, stone
05 Metals Structural steel, metal deck, misc. metals
06 Wood, Plastics and Composites Framing, blocking, millwork, casework
07 Thermal and Moisture Protection Insulation, roofing, waterproofing, sealants, firestopping
08 Openings Doors, frames, hardware, windows, storefront, glazing
09 Finishes Drywall, ceilings, flooring, tile, paint
10 Specialties Toilet partitions, accessories, signage, lockers
11 Equipment Food service, laboratory and other built-in equipment
12 Furnishings Window treatments, furniture, casework
13 Special Construction Pre-engineered buildings, special structures
14 Conveying Equipment Elevators, escalators, lifts

Facility services

Division Title Covers
21 Fire Suppression Sprinkler and standpipe systems
22 Plumbing Piping, fixtures, water heaters
23 Heating, Ventilating and Air Conditioning (HVAC) Equipment, ductwork, piping, controls
25 Integrated Automation Building automation systems
26 Electrical Power, lighting, distribution
27 Communications Structured cabling, data, voice, AV
28 Electronic Safety and Security Fire alarm, access control, CCTV

Site and infrastructure

Division Title Covers
31 Earthwork Grading, excavation, fill, soil treatment
32 Exterior Improvements Paving, curbs, fencing, landscaping
33 Utilities Water, sewer, storm drainage, site power
34 Transportation Rail, roadway and airport systems
35 Waterway and Marine Construction Docks, dredging, marine structures

Process equipment

Division Title
40 Process Interconnections
41 Material Processing and Handling Equipment
42 Process Heating, Cooling and Drying Equipment
43 Process Gas and Liquid Handling, Purification and Storage Equipment
44 Pollution and Waste Control Equipment
45 Industry-Specific Manufacturing Equipment
46 Water and Wastewater Equipment
48 Electrical Power Generation

How contractors use the divisions

  • Estimates are organized by division so every cost line matches a specification section.
  • Bid packages are split by division so each subcontractor knows exactly what to price.
  • Schedules of values for payment applications follow the same structure.
  • Scope gaps are easier to spot. If a section in the spec has no line in the estimate, something is missing.

Most common divisions on commercial projects

A typical office, restaurant, school or retail project uses Divisions 01 through 14, the facility services divisions 21 to 28, and the site divisions 31 to 33. Process divisions 40 to 48 appear mostly on industrial, water treatment and power projects.

Estimates by CSI division

Premium Estimating organizes every estimate by CSI division, with a separate page for each one. Browse estimating by CSI division or send us your plans for a quote.

Need a number you can bid from? Send us your plans for a quote, or see our pricing.
FAQ

Common questions

Can't find your answer? Call (850) 343-4090 or email info@premiumestimatings.com.

How many divisions are in CSI MasterFormat?

MasterFormat has 50 division numbers, 00 to 49, but several numbers are reserved for future use. About 35 divisions are in active use.

What happened to the old 16 divisions?

The 16-division format was replaced in 2004. Mechanical (old Division 15) and Electrical (old Division 16) were split into several new divisions, such as 22 Plumbing, 23 HVAC, 26 Electrical and 27 Communications.

What is the difference between a division and a section?

A division is the top level (for example 03 Concrete). Sections are the detailed numbers under it (for example 03 30 00 Cast-in-Place Concrete).

Why are estimates organized by CSI division?

It lets contractors, owners and architects compare costs line by line, match the specifications, and see which trade carries each scope.

Free download: The Commercial Bid Estimating Guide 2026, a printable checklist of commonly missed scope by CSI division. Get the PDF →
Send plans

Send Us the Plans. Get a Quote.

Send your drawings and we'll reply with a price and delivery date before any work starts.

  • Clear price and delivery date up front
  • NDA signed on every project
  • Excel estimate organized by CSI division
  • Marked-up plans showing every quantity
  • 50% to start, 50% on delivery
Prefer email or phone?info@premiumestimatings.com(850) 343-4090

Your details

Upload drawings / plans
Drop files here or click to browsePDF, ZIP, DWG, DXF, XLSX, DOC, JPG · up to 5 files, 8 MB total
    Large plan sets: share a link instead of uploading.

    By sending, you agree to our Privacy Policy.

    Get a Quote Chat on WhatsApp