Key takeaways
- Hoods, makeup air and fire suppression are major costs
- Grease interceptors depend on local authority rules
- Clarify who supplies, sets and connects each piece of equipment
- Renovations add trenching, roof work and utility upgrades
Commercial kitchens are some of the most service-intensive spaces in construction. Restaurants, schools, hospitals, hotels and corporate cafeterias all need kitchens that meet health, fire and building codes. The cost to build a commercial kitchen goes far beyond the cooking equipment. This guide explains the line items contractors price and where budgets usually go wrong.
Why commercial kitchens cost more per square foot
A commercial kitchen packs heavy mechanical, plumbing, gas, electrical and fire protection work into a small area. Compared with an office space of the same size, it needs:
- Exhaust hoods and duct to the roof
- Makeup air units
- Fire suppression over cooking lines
- Grease waste systems and interceptors
- Floor drains and floor sinks
- Gas piping to cooking equipment
- Many dedicated electrical circuits
- Durable, cleanable finishes
1. Exhaust hoods and makeup air
Type I hoods over grease-producing equipment need welded grease duct, fire-rated enclosures or wraps, exhaust fans on the roof, and makeup air units to replace the exhausted air. Roof curbs, structural support and crane lifts may be needed.
2. Fire suppression
Wet chemical suppression systems over the cooking line are required for grease-producing equipment. They connect to gas shutoff valves and the fire alarm system.
3. Plumbing
- Grease interceptor, often outside the building or below the floor
- Floor sinks under equipment and floor drains
- Hand sinks, prep sinks, three-compartment sinks and mop sinks
- Hot water capacity for dishwashing, often a dedicated water heater or booster
- Indirect waste connections for ice machines and refrigeration
Underground plumbing for kitchens is often extensive and may require saw cutting and trenching in existing slabs on renovations.
4. Gas piping
Gas lines to ranges, fryers, ovens and water heaters, with shutoffs connected to the suppression system.
5. Electrical
Kitchens need many dedicated circuits, often at higher voltages, for ovens, dishwashers, refrigeration, mixers and warmers. Panel capacity may need upgrading. Hood lights, controls and fan interlocks add work.
6. Refrigeration
Walk-in coolers and freezers need insulated panels, insulated floors or depressed slabs, refrigeration systems and condensing units, often on the roof.
7. Finishes
Health codes require cleanable surfaces:
- Quarry tile or epoxy floors with coved base
- FRP or stainless steel wall panels
- Washable ceiling tiles or gypsum with special paint
- Stainless steel corner guards
8. Equipment
Cooking, refrigeration, dishwashing and prep equipment may be supplied by the owner, a food service equipment contractor or the general contractor. Clarify who supplies, who sets and who connects each item.
Renovation costs
Converting an existing space into a kitchen often adds:
- Saw cutting and trenching for underground plumbing
- New roof penetrations and structural framing for hoods
- Upgraded electrical service
- Separation of grease duct through upper floors
Budget risks
- Grease interceptor size and location required by the local authority
- Utility capacity: gas, water and electrical service
- Roof structure strength for exhaust fans and makeup air units
- Health department review changes
- Long lead times on hoods and refrigeration
Getting a reliable number
Early budgets for kitchens are often too low because they use average construction costs per square foot. A detailed estimate of the MEP scope, using the kitchen equipment plan, gives a far more reliable number. Read our guide on how to estimate a restaurant build-out for the full checklist.
Health department and permit review
Commercial kitchens must be approved by the local health department as well as the building department. Plan review may require changes to sinks, finishes, floor drains or equipment layout, and inspections must be passed before opening. Allow time in the schedule for review and for corrections. Estimates should note the code edition and health department requirements assumed. If drawings have not yet been approved by the health department, include a clarification that changes required by their review will be priced as a change.