Key takeaways
- Choose jobs that match your experience, area and backlog before estimating
- Read Division 00 and 01 of the specs; they set bonds, schedule and requirements
- Price general conditions from the schedule, not as a guess
- A clear scope letter protects your margin as much as the number
Bidding is where a construction company makes or loses most of its money. A good bid wins work you can build profitably. This guide walks through the process most successful commercial contractors follow, from the invitation to bid to the moment the number is submitted.
Step 1: Decide if the job is worth bidding
Before anyone opens a takeoff program, ask a few honest questions. Is the project type something your crews have built before? Is the location within your normal working area? Does the schedule fit your backlog? Do you know the owner or general contractor, and do they pay on time? How many other bidders are on the list?
A job that fails two or three of these questions is usually a bid you should pass on. Every estimate takes hours of skilled time, so choosing the right jobs to bid is the first step to a better hit rate.
Step 2: Collect and review the bid documents
Download the complete bid set, including all addenda and the bid form. Read Division 00 and Division 01 of the specs carefully, because they set the rules for bonds, insurance, schedule, allowances, alternates and general requirements.
Make a list of questions as you read. Missing details, conflicts between drawings and specs, and unclear scope boundaries should go to the architect as RFIs before the question deadline. Our guide on how to review a bid set before pricing covers this step in more depth.
Step 3: Do the quantity takeoff
The takeoff is the measured list of everything you will build: cubic yards of concrete, linear feet of wall, square feet of drywall, number of fixtures, tons of steel. Measure from the drawings, organize the quantities by CSI division, and keep a marked-up set of plans so anyone can see where each number came from.
Add waste factors to materials, not labor.
Step 4: Price materials, labor and equipment
Each line in the takeoff needs a unit cost for material, labor and equipment.
- Materials: use current supplier quotes for big-ticket items and recent pricing for the rest. Note how long each quote is valid.
- Labor: multiply the quantity by a production rate (hours per unit) and your crew's loaded hourly rate, including taxes, insurance and benefits.
- Equipment: lifts, excavators, cranes and rentals, priced for the real duration on site.
If the project is prevailing wage, use the wage determination for the county and trade, not your normal rates.
Step 5: Get and level subcontractor quotes
If you are a general contractor, send invitations to subcontractors early and follow up. When the quotes arrive, compare them scope for scope. One electrician may include temporary power and another may exclude it. Leveling the quotes means adding the missing items back in so you compare like with like. See our article on bid leveling for a simple method.
Step 6: Add general conditions and markups
General conditions cover the cost of running the job: supervision, the site trailer, temporary utilities, cleanup, dumpsters, small tools, permits and insurance.
Then add overhead and profit. Overhead pays for your office, estimators, accounting and vehicles. Profit is what you earn for the risk. Add bond and insurance costs if they are required, and check the order in which your markups are applied.
Step 7: Write the scope letter
Your number is only as good as the scope behind it. Attach a clear list of inclusions, exclusions and clarifications. State which addenda you included, how long your price is valid, and any assumptions about schedule, working hours, testing or permits. A clear scope letter protects your margin and makes your bid easier for the owner to compare.
Step 8: Check the bid before it goes out
On bid day, run a final review:
- Every addendum is acknowledged on the bid form.
- Totals on the summary sheet match the sum of every division.
- The cost per square foot looks reasonable compared with similar past jobs.
- Plugs for missing subcontractor quotes are flagged.
- Bonds, insurance certificates and required forms are signed and attached.
A second person reviewing the estimate catches mistakes the estimator no longer sees after hours of work.
When to get help with your bids
Many contractors lose good opportunities simply because there is no time to price them. An outsourced estimating team can prepare the takeoff and estimate while you focus on running jobs and building relationships. Premium Estimating LLC prepares bid-ready estimates in Excel, organized by CSI division, with marked-up plans for every quantity. You can see the format in our sample estimates before you order.