Key takeaways
- Start with gear and distribution, the largest cost items
- Check mechanical and kitchen drawings for equipment connections
- Labor units must be adjusted for height, access and conduit type
- Compare cost per square foot with similar buildings as a final check
Electrical work is often one of the largest trades on a commercial project, and one of the most detailed to estimate. A good electrical estimate counts every device, measures every run, prices the major equipment correctly, and applies realistic labor. This guide walks through the process used by experienced electrical estimators.
Step 1: Read the whole electrical set
Before counting anything, review:
- The symbol legend and general notes
- One-line diagram and riser diagrams
- Panel schedules and load calculations
- Lighting fixture schedule
- Power, lighting, systems and site plans
- Specifications in Division 26, and also 27 and 28 if low voltage and fire alarm are in your scope
Also look at the mechanical, plumbing, kitchen and architectural drawings. Equipment that needs power is often shown there, not on the electrical sheets.
Step 2: Gear and distribution
Start with the big-ticket items:
- Service entrance, switchboards and switchgear
- Transformers
- Panelboards
- Feeders between them, with conduit and wire sized from the one-line
- Generators, transfer switches and surge protection
These items often make up a large share of the cost and can have long lead times, so get supplier quotes early.
Step 3: Count devices and fixtures
Count by type, floor and area:
- Receptacles: duplex, GFCI, dedicated, floor boxes
- Switches, dimmers and occupancy sensors
- Lighting fixtures by type from the fixture schedule
- Exit and emergency lights
- Junction boxes and equipment connections
Digital takeoff tools make counting faster and colour-code each symbol so nothing is missed.
Step 4: Measure branch circuits
Branch circuit conduit and wire are usually estimated by measuring the home runs and estimating the circuit length within each area. Some estimators use an average length per device for certain room types. Either way, include vertical drops from ceiling to device height.
Step 5: Feeders
Measure each feeder from the one-line and floor plans, routing along realistic paths, not straight lines. Add vertical rises, and add allowances for terminations and slack.
Step 6: Apply labor units
Labor is usually estimated with labor units: standard hours per item, such as per receptacle installed or per 100 feet of conduit. Adjust them for:
- Working height and access
- Conduit type (EMT, rigid, PVC) and installation method
- Existing occupied buildings
- Repetition on large projects
- Crew experience
Labor is often the largest single cost in electrical, so productivity assumptions matter.
Step 7: Low voltage and systems
Check whether fire alarm, data cabling, security, access control and audio-visual are in the electrical contract or separate. If they are included, take them off separately, as they have their own pricing and labor.
Step 8: Price material
Use current supplier pricing. Copper wire and gear prices move significantly, so note when pricing was received and how long it is valid. Include fittings, boxes, supports and small materials, often as an allowance on top of major items.
Step 9: Add job costs and markup
- Temporary power and lighting, if in scope
- Permits and inspection fees
- Lift and equipment rental
- Supervision
- Overhead and profit
Commonly missed items
- Power to mechanical units, pumps and water heaters
- Kitchen equipment connections
- Door hardware and access control power
- Site lighting and parking lot poles
- Trenching and backfill for site feeders
- Fire stopping at penetrations
- Spare conduits required by the utility
- Coordination with utility company work
A quick check on the total
Once the estimate is complete, compare cost per square foot with similar buildings. Our commercial electrical cost calculator gives a rough range by building type. If your number is far off, look for missed gear, wrong fixture counts or unusual labor.
Pricing switchgear and long-lead items
Switchgear, transformers, panelboards and generators can make up a large share of an electrical estimate, and their prices and lead times have been unpredictable. Get written quotes from more than one supplier, confirm what each includes, and note how long the price is valid. If lead times are long, check whether the project schedule allows for them, and clarify in your proposal that delivery dates depend on the release of approved submittals. Some contractors add an escalation clause for gear on projects that will be bought months after bid day.
Get your electrical takeoff done
Premium Estimating LLC prepares electrical estimates with device and fixture counts, conduit and wire measured by size, gear priced from the one-line, and labor hours for every item. Download our electrical sample from the sample estimates page to see the format.