Key takeaways
- Read the specs and every addendum before pricing
- Check other trades' drawings for your scope
- Use current prices and your own productivity data
- Always have a second person review the bid
Most contractors who lose money on a job can trace the problem back to the estimate. The good news is that estimating mistakes follow patterns. Knowing them makes them much easier to avoid. Here are twelve of the most common, and how to prevent each one.
1. Not reading the specifications
Drawings show what to build; specifications describe how and with what. Many items exist only in the specs: testing, mockups, special warranties, extra coats, specific products. Read Division 00, 01 and every section in your trade before pricing.
2. Missing addenda
Addenda can add or remove scope up to the day before bid. List every addendum, note what changed, and acknowledge them on the bid form. Missing one can make your bid non-responsive or leave out scope.
3. Measuring only one floor or area
"Typical" floor plans and enlarged plans repeat. Multiply correctly, and check sections and elevations for work that does not appear in plan views.
4. Ignoring other trades' drawings
Equipment connections, kitchen equipment, door hardware power and site utility connections often appear on mechanical, food service, architectural or civil sheets, not on your trade's drawings.
5. Using old prices
Material prices change. Using last year's unit costs, especially for steel, copper, lumber or asphalt, can wipe out margin. Get current quotes for major items and note their dates. See our guide to material escalation.
6. Unrealistic labor productivity
Labor is often the largest and most variable cost. Using production rates from an easy job on a difficult one, such as tall ceilings, occupied buildings or phased work, underestimates hours. Track your own crew productivity and use it.
7. Wrong waste factors
Too little waste means running out of material; too much makes your bid uncompetitive. Use waste factors based on material type and layout. See our waste factors table.
8. Forgetting general conditions
Supervision, temporary facilities, cleanup, dumpsters and equipment for the full duration are real costs. Price them from the schedule, not as a guess. Read our guide to general conditions.
9. Markup errors
Applying overhead and profit to the wrong subtotal, forgetting bonds, or confusing markup with margin. Use a consistent summary sheet and check the math. Our guide to overhead and profit explains markup vs margin.
10. Accepting incomplete subcontractor quotes
A low sub quote with big exclusions can cost more after award. Level every quote scope for scope before carrying it. See bid leveling.
11. Vague exclusions and clarifications
If your scope letter is unclear, disputes follow. List what is included, excluded and assumed, in plain language. Our guide to bid clarifications and exclusions shows how.
12. No review before submission
Estimators who work for hours on a bid stop seeing their own errors. A second person reviewing totals, quantities and the summary catches mistakes like a missing division or a misplaced decimal.
A simple review checklist
- Totals on the summary equal the sum of all divisions
- Cost per square foot compared with similar jobs
- Every addendum included
- Every spec section in your scope reviewed
- Major quantities checked against building size
- Sub quotes leveled
- Markups applied correctly
- Clarifications and exclusions attached
Learning from every bid
Track your results. When you win a job, compare actual costs with the estimate after completion. When you lose, ask for bid results. Over time, this feedback improves your unit costs and productivity data.
Free checklist
Our free Commercial Bid Estimating Guide 2026 is a printable PDF with a bid set checklist, commonly missed scope by CSI division and a bid day checklist.
Building an estimating process that prevents errors
The best way to avoid mistakes is a repeatable process. Use the same estimate template on every bid, with standard divisions, markups and checks. Use checklists for each trade. Keep marked-up plans so anyone can see what was measured. Store unit costs and productivity data in one place and update them after every job. Schedule a review meeting before every major bid. These habits make good estimates routine instead of relying on one person's memory.
Let a second team check your numbers
Premium Estimating LLC prepares estimates with marked-up plans, clear quantities and separate material and labor lines, so every number can be checked. Contractors also use us as a second set of eyes on large bids. See our sample estimates.