Key takeaways
- List the documents and addenda you priced
- Specific inclusions beat long generic exclusions
- Breakdowns by area or system make leveling easier
- Send scope early and confirm the final price on bid day
For a subcontractor, the bid proposal is the product the general contractor sees. A competitive price matters, but GCs also judge how complete, clear and easy to use a proposal is. Many subs lose work not because their price is high, but because their scope is vague or hard to compare. Here is how to write a proposal that GCs trust.
Know what the GC is doing on bid day
On bid day, a GC estimator receives dozens of quotes in the last few hours. They must compare each trade's quotes, fill missing scope, and choose a number for every division before the deadline. A proposal that is easy to read and complete makes their job easier, which makes it more likely to be carried.
1. Header and project details
- Your company name, license number, address and contact
- The GC you are bidding to and the estimator's name
- Project name and location
- Date and bid due date
- The drawings, specifications and addenda you used, listed by number and date
Listing the documents protects you if a later addendum changes the scope.
2. The price
State the base bid clearly. If useful, break it down by building, phase or system, for example underground plumbing, above-ground rough-in and fixtures. Breakdowns help the GC compare quotes and adjust if scope is split differently.
3. Inclusions
List what you are including in plain language, organized by specification section. Be specific: "Furnish and install all 2x2 lay-in ceiling tile and grid per sheet A-601" is better than "ceilings".
4. Exclusions and clarifications
This is where many disputes start. List clearly what you are not including, for example:
- Permits and fees, unless stated
- Bonds, unless stated
- Patching and painting by others
- Temporary utilities
- Work outside the building line
- Overtime or night work
- Engineering or delegated design
- Testing by others
Avoid long, generic exclusion lists copied from old proposals. GCs notice them, and too many exclusions make your price look less complete.
5. Alternates and unit prices
Price every alternate and unit price requested in the bid documents. If you can offer a voluntary alternate that saves money, such as a different material that meets the spec, list it separately and keep your base bid compliant.
6. Schedule and terms
- Duration or crew assumptions
- Lead times for long-lead material
- Price validity period
- Payment terms and retainage
- Any escalation clause for volatile materials
7. Make it easy to level
GCs compare quotes in a leveling sheet. You can help by following the specification section numbers, using the same building or area names as the drawings, and showing material and labor separately if asked. Read our guide to bid leveling to see how GCs evaluate your proposal.
8. Send early, then confirm
Send a preliminary scope a day early so the GC can review it and ask questions. Then send the final price close to the deadline. Call to confirm it was received and answer any scope questions.
Common mistakes
- Not listing addenda used
- Vague scope descriptions
- Copy-paste exclusions that contradict the specs
- Missing alternates or unit prices
- Price only in the email body with no written scope
- Sending at the last minute with no time for questions
After the bid
Ask for feedback, especially when you lose. Some GCs will tell you whether you were high, low or missing scope. Keep track of your results by GC and project type.
Pricing format general contractors prefer
Many general contractors appreciate quotes that follow the specification section numbers and the building areas shown on the drawings. If the project has several buildings, phases or alternates, give a separate price for each. Show material and labor separately when the GC asks, especially on projects where the owner may buy materials directly. Include your license number, insurance confirmation and bonding ability on the proposal, because GCs often check these before carrying a new subcontractor. A consistent, professional format across every bid also helps you build a reputation with estimators.
Strong proposals start with a strong estimate
A clear proposal depends on an accurate takeoff and estimate behind it. Premium Estimating LLC prepares trade estimates for subcontractors with quantities, labor hours and material pricing, ready to turn into a proposal. See our subcontractor estimating service or download a trade sample from our sample estimates.