Hour 0
You send plans, specs, addenda and the bid due date. We reply with a price and a delivery time.
Rush construction estimating for contractors with close bid dates. Send your plans today and receive a bid-ready Excel estimate with marked-up plans, usually within 12–24 hours for a single trade.
Bid invitations rarely arrive with enough time. Addenda change the scope two days before the due date, a GC sends a late invite, or three bids land on the same Friday. When that happens, the choice is usually to skip the bid or rush the number.
Our rush estimating service gives you a third option. Send the drawings with your bid date and time, and we schedule the takeoff and pricing so the estimate reaches you with time to review it, add your markup and submit.
Our estimators work across US time zones, including overnight hours. Plans sent in the afternoon or evening in the United States are often priced by the next morning, which is why most single-trade estimates are delivered in 12–24 hours.
Rush work is common for general contractors who receive subcontractor coverage gaps late, and for trade subcontractors invited to bid by several GCs on the same project. In both cases a reliable number delivered on time is worth more than a perfect number delivered after the bid closes.
Speed does not change the process. Every quantity is measured in PlanSwift or Bluebeam, priced with local material and labor rates and checked before delivery, and the marked-up plans show exactly what was counted.
You send plans, specs, addenda and the bid due date. We reply with a price and a delivery time.
The 50% deposit confirms the slot and your estimator starts the takeoff immediately.
Quantities are measured by drawing sheet and colour-coded, so every count can be checked.
Material, labor and equipment are priced for your project location, with waste shown separately.
A second estimator checks quantities and totals against the drawings before delivery.
You receive the Excel file and marked-up plans with time to add markup and submit.
Single-trade estimates start from $300, and standard delivery for most single trades is already 12–24 hours. A same-day turnaround on a large drawing set, or a deadline over a weekend or holiday, may cost more. You always get the price and delivery time in writing before any work starts.
Delivery time depends on the size of the drawing set, the number of trades, the quality of the drawings and how many addenda are expected. Full-project GC estimates for large buildings usually need more than 24 hours, and we will tell you plainly if a deadline is not realistic rather than send a rushed number.
If you bid every week, a monthly estimating plan gives you priority scheduling on bid days, so you never have to wait in line.
A few simple steps save hours on a rush job. Send the complete drawing set in one link rather than sheet by sheet, include the specifications and every addendum issued so far, and tell us exactly which trades and scope you are pricing, including anything you plan to exclude.
Tell us the bid due date, time and time zone, and whether you need a budget number first. If the bid form has unit prices or alternates, send it too, so the estimate is laid out the way you need to submit it.
If you already have labor rates, crew productivity or supplier quotes you want used, include them. Otherwise we price with current local market rates for the project location.
Rush estimates by trade: electrical, plumbing, HVAC, concrete, drywall, masonry, roofing and sitework, plus full GC estimates.
Can't find your answer? Call (850) 343-4090 or email info@premiumestimatings.com.
Most single-trade estimates are delivered in 12–24 hours after the deposit. For larger multi-trade sets we confirm the exact delivery time before work starts, and we will tell you honestly if a deadline cannot be met.
Standard delivery is already 12–24 hours for most single trades. Very tight deadlines on large drawing sets, or weekend work, may cost more. The price is always confirmed in writing before we start.
The full drawing set or a link to it, the specifications if available, the trades you need priced, any addenda and the bid due date and time with time zone.
No. The same takeoff and review process is used. On rush jobs we list assumptions clearly, so you know exactly what is included before you submit.
Yes. Our team works across US time zones, including overnight hours, so plans sent in the evening can be priced by the next morning Eastern time.
Send them as soon as they are issued. We update quantities and show what changed so your bid reflects the latest documents.
Send your drawings and we'll reply with a price and delivery date before any work starts.